Week 2: 4/10/15 Proposal Revised and Full Plan

Week 2
4/10/15

New design proposal was finished.


Details about current status and plans were discussed in the meeting. Possible idea would be testing the real cell phone charger to see the waveform and voltage produced.  


Full plan was finalized: generator -> (possible transformer) -> full-wave rectifier -> LM 7805 regulator -> USB socket.